Layout requirements of dry-type transformer

24-01-22

Layout requirements of dry-type transformer

Dry-type transformer factory is an important place for the production of dry-type transformers. Dry-type transformer layout is an important kind of dry-type transformer production should pay attention to the problem, dry-type transformer layout is also a lot of knowledge, dry-type transformer layout should pay attention to what:

Whether it can be installed in parallel depends on whether there are any coercive rules in the regulations, on your requirements for operation, inspection and reliability, and on whether the site is allowed. Generally speaking, the high-voltage cabinet and dry-type transformer are not installed in parallel. In many cases, the high-voltage switchgear and dry-type transformer are installed in parallel. However, according to the requirements of Chapter 4 of "Imaginary Scale for Substation of 10KV and Below", when there are exposed live conductors, the net distance between the two should not be less than 2 meters. When the top surface closed shell protection reaches IP2X, the two can be installed close to each other. High and high voltage power distribution assemblies without combustible oil and non-oil-immersed power transformers with IP3X protection and other enclosures can be installed close to each other in the workshop when the environment answers.

Previous article: